Posts

Showing posts from May, 2021

How LOD450 and 5D BIM services are interconnected with one another for pre-construction and early design stages for the construction project?

Image
  The process of pre-construction and conceptual design process is a long seen work that cannot be avoided and it is due to the size of the project. In the past, the traditional method, as well as early architectural concepts and designs, were known to be a lengthier process and for the same, the discussion for the same too was taking a lot of time. Not only this but the owner and architect both need to have a discussion on various channels and also if there are any changes required to be done to an existing facility.   It is very much necessary that before the start of the project there should be an early conversation between the two parties as this stage is the reason for any project's success. This is where the task of 5D BIM Services comes into the picture. This stage of work helps in evaluating the conceptual design, and then at the later stage assessing the overall project's budget and its schedule. Thus, this is the process in which the building needs to assign the work